Skip to content
Networks

Case Studies

Proven on mission-critical stages

5 completed events across corporate, foundation, and live-production environments where network failure was not an option. We run and stand behind your event's mission-critical network — load-in to strike — so ticketing, payments, production and streaming stay connected.

The record so far

A deliberately small, high-stakes portfolio. Each engagement was delivered as a segmented Critical Operations Network overlay — behind the venue circuit, never bypassing venue exclusivity — with documented pre-opening acceptance testing and monitoring through strike.

5
completed events
4
named reference clients
1
confidential reference
Transport layer
one accountable scope
A note on proof: we publish only what we can substantiate. Event-specific metrics, quotes, and outcomes are documented in each engagement’s post-event report and published here only when the client has authorized them.

Client references

Mission-critical environments where revenue, reputation, and the show itself depended on the network staying up.

Monday.comTwilioObama Foundation (Obama Presidential Center Library)Tony Robbins

What we measure

Every deployment is measured on availability and failover performance against the targets defined for the event — not vanity bandwidth numbers. These are the outcomes captured in the post-event report on each engagement above.

  • Pre-opening acceptance-test pass rate — segmentation holds and critical paths are live before doors
  • Mean time to failover on critical WAN and LAN paths
  • Venue-access qualification and written authorization secured before any non-refundable spend
  • Severity-one incident count across connectivity and security
  • Wired coverage of payments, registration, production, encoders, and staff
  • Segmentation integrity across payment, registration, production, staff, and management traffic
  • Monitoring continuity from setup through teardown
  • Transparent, line-item cost accounting in the post-event report
Scope of our accountability. LGL operates at the transport layer. We stand behind the network and transport we operate — availability, redundancy, and segmentation — not the vendor applications (payment, registration, or production apps) that ride on it.

How every engagement runs

The same commercial and technical motion behind all five events.

Risk Assessment

Venue rights, critical applications, segmentation design, and data-responsibility assumptions — before circuit orders or freight.

Venue authorization

Written venue authorization secured before any non-refundable spend. We supplement venue circuits where permitted; we never bypass exclusivity.

Critical Operations Overlay

Segmented LAN and wired drops for payments, registration, production, and staff — behind the venue circuit.

Monitor & report

Pre-opening acceptance, failover testing, onsite response, NOC monitoring through strike, and a post-event report.